尊龙z6官网ag

首页
关于z6尊龙凯时
业务领域
服务&能力
业绩成就
新闻中心
投资者关系
联系尊龙z6官网ag
  • 1
  • 2
  • 3

经典案例

当前位置:首页 > 业绩成就 > 经典案例

Europe and Asia New Materials (Nanjing) Co., Ltd. special ester project

       2013.08~2014.05 Ouya Asia New Materials (Nanjing) Co., Ltd. 20,000 tons / year special ester project, the company responsible for the scope of work include: machinery, pipelines, electrical installation.
        65 static equipment, 1 set of air-cooled equipment (field assembly & installation). Pumps, blenders and other moving equipment 85 units. 10 filters, 4 sets of vacuum units, 2 sets of freezer units, 2 sets of vehicles, 1 set of balance, 9 loading and unloading arms. Pipeline 66774DIN, 2 dry-type transformers, 72 power disk cabinets, lighting 730 sets, 720 meters high-voltage cables, cable tray 1080 meters. Galvanized cable protection tube of 10,000 meters, low voltage electrical cables of more than 100,000 meters; dashboard cabinets 25 units, 391 sets of off-line instruments, 412 on-line instruments, instrument cable bridge 11,596 meters, 67,000 meters cable meters. Paint 2295 square meters, equipment insulation 442 cubic meters, pipe insulation
 
首页
关于z6尊龙凯时
z6尊龙凯时优势
董事长致辞
历史沿革
组织架构
投资者关系
社会责任
企业价值观
业务领域
化工行业
油气能源行业
水处理行业
矿业
服务&能力
工业模块设计和制造
工程总承包
工程设计
工程施工
工程采购
工程维保
业绩成就
主要客户
主要业绩
经典案例
新闻中心
公司新闻
行业动态
媒体报道
企业期刊
团队建设
企业文化活动
z6尊龙凯时视频
z6尊龙凯时风采
联系尊龙z6官网ag
联系尊龙z6官网ag
人才招聘
协同OA系统(外网) 协同OA系统(内网)
©2004-2020 尊龙z6官网ag股份有限公司 版权所有 苏ICP备60399710号|

苏公网安备 32058202010920号

尊龙z6官网ag